toilet block construction – Emmanuel Care and Advice Centre

ToiletBlockTargetAchieved

PROJECT GOALS

To build a toilet block on the current site from which the project operates

DETAILS

Located in Kwanoxolo Township, Port Elizabeth, South Africa

The site currently hosts a pre-school with a porta-loo, which is a health risk. Whilst unpleasant for the carers it is even more important to consider the children’s needs. The children attending the pre-school come from disadvantaged homes, it is important that they are taught good hygiene from an early age. This is difficult when the toilet is in itself a problem. The funds raised will provide a more permanent and hygienic solution.

The project, which has 33 home based carers, over 600 hundred clients who are infected or affected with HIV, runs support groups for the aged, orphans, vulnerable children and AIDS sufferers.

DELIVERY PARTNER

Building of the toilet block will be facilitated by Emmanuel staff and monitored by Calabash Trust. 2 Emmanuel board members come from the construction industry. Labour will be drawn from the local community, strengthen community ties with the project.

Emmanuel is the centre of hope for local people. Supported and working with the Dept. of Social Services it carries the local mandate for home-based care in the area. Over 600 clients (infected or affected by HIV) and close to 500 orphans and vulnerable children are dependent on the centre. The board of Trustees are drawn from the community, to ensure the organisation remains a rooted Community Based Organisation.

PROJECT TARGET

Total required circa £3,582 46,466 ZAR

Items

clear ground and excavate foundations 2500 ZAR

foundations and concrete 12,658 ZAR

timber framework and provide water tight roof 4,666 ZAR

doors with steel framework and fix 1,896 ZAR

windows with steel framework for borrowed light and fix 1,366 ZAR

toilets and fix 2,360 ZAR

drainage and backfill trench 2,050 ZAR

bring water supply to nearest point 1,940 ZAR

wash basins for hand washing and fix 1,545 ZAR

ventilate building 1,050 ZAR

outside shelter, external tap and large sink for washing 1,525 ZAR

finishing-painting and varnishing 1,900 ZAR

Vat @14% R3769

Contingency fund 3,069 ZAR

Overseeing and monitoring on a weekly basis 4,172 ZAR*

*retained by Associated partner  Calabash Trust

Running costs will include cleaning materials and maintenance, this will be met by Emmanuel from general funds